Pipeline Surveying

Overview

Astrolabe Engineering provides mapping, topographical and land surveying services to support all stages of Natural Gas, Oil and Water pipelines design and construction:

  • Feasibility study
  • Basic design
  • Routing verification / optimization
  • Front End Engineering Design (FEED)
  • Detail engineering
  • Right of way (ROW) land easement and acquisition (LEA)
  • Construction

Related projects:

  • Crude Oil Pipeline from Thessaloniki to Skopje: 220 km
    • Detail Engineering
    • Right of way (ROW) land easement and acquisition (LEA)
  • Natural Gas Pipeline from Stefani to Aliveri: 57 km
    • Detail Engineering
    • Right of way (ROW) land easement and acquisition (LEA)
  • Natural Gas Pipeline from Ag. Theodori to Megalopoli: 159 km
    • Basic Design
  • Natural Gas Pipeline Interconnector Greece-Italy (IGI): 600 km
    • Basic Desing
  • Natural Gas Pipeline Interconnector Greece-Bulgaria (IGB): Greek Section: 32 km
    • Detail Engineering
    • Right of way (ROW) land easement and acquisition (LEA)
  • Natural Gas Transadriatic Pipeline (TAP): 550 km
    • Right of way (ROW) land easement and acquisition (LEA)