Astrolabe Engineering provides mapping, topographical and land surveying services to support all stages of Natural Gas, Oil and Water pipelines design and construction:
Feasibility study
Basic design
Routing verification / optimization
Front End Engineering Design (FEED)
Detail engineering
Right of way (ROW) land easement and acquisition (LEA)
Construction
Related projects:
Crude Oil Pipeline from Thessaloniki to Skopje: 220 km
Detail Engineering
Right of way (ROW) land easement and acquisition (LEA)
Natural Gas Pipeline from Stefani to Aliveri: 57 km
Detail Engineering
Right of way (ROW) land easement and acquisition (LEA)
Natural Gas Pipeline from Ag. Theodori to Megalopoli: 159 km
Basic Design
Natural Gas Pipeline Interconnector Greece-Italy (IGI): 600 km
Basic Desing
Natural Gas Pipeline Interconnector Greece-Bulgaria (IGB): Greek Section: 32 km
Detail Engineering
Right of way (ROW) land easement and acquisition (LEA)
Natural Gas Transadriatic Pipeline (TAP): 550 km
Right of way (ROW) land easement and acquisition (LEA)